Mission Control · Sprint Tracker

Choose a Sprint Tracker

The tracker, split by delivery stage. Open the MVP, the Fast Track, or the Later work, each locked to its own stage. The previous tracker is kept for reference.
By stage
🎯

MVP Launch

Only the work that has to ship for the late-November launch. The Command Center, kanban and every tab are locked to MVP tickets, so this is the view to run the launch from.

Fast Track Fast-follow

The fast-follow work lined up right after launch: the features and hardening that come next once the MVP is live. Locked to Fast Track tickets across every tab.

📚

Later Backlog

The deeper roadmap held for later: the graph moat, public API and the bigger bets. Locked to Later tickets so the long-term plan is easy to read on its own.

Reference
📅

Old tracker Reference

The previous 22-sprint tracker as it stood before the stage split — Sprints 1–5 complete, S6–23 against the pre-lock scope. Kept intact for reference.